Assess the cavity
We look at roof size, pitch and existing airflow to work out how many vents you actually need — no over-selling.
Whirlybird Installation MelbourneNorthern SuburbsWollert
Little tree shade across Wollert's open estate blocks means roofs take the full summer sun, and the cavity above the ceilings heats up fast as a result.
Melbourne & Surrounding Suburbs













Whirlybird Installation · Wollert
Little tree shade across Wollert's open estate blocks means roofs take the full summer sun, and the cavity above the ceilings heats up fast as a result. Whirlybirds let that trapped heat escape before it radiates down into the rooms below. On Wollert's concrete-tile roofs we lift the tile course at the vent, cut the penetration, bed the flashing watertight, and seat the turbine; on the newest Colorbond estate roofs the vent is flashed straight into the sheeting. Out on the growth corridor where Wollert bakes in summer, a few well-placed turbines take real load off the cooling.
Wollert's exposed estate blocks and northern-fringe location mean roofs bake in summer with no tree cover to help, so venting the cavity does more here than in a shaded inner suburb.
Local roof weather
Wollert sees around ~6 days above 35°C a year, and on those days an unventilated roof cavity turns into a heat store right above your ceilings.
Climate normals (2015–2024) from Open-Meteo ERA5 reanalysis — gridded reanalysis, so rainfall is an estimate that runs a little high versus long-term gauge averages. Live UV from ARPANSA, live conditions from Open-Meteo.
The process
We look at roof size, pitch and existing airflow to work out how many vents you actually need — no over-selling.
Vents go high on the roof where the hottest air collects, balanced with the eave intake so air can actually move through.
On a tiled roof we lift the tiles, cut a neat penetration, and bed the flashing so it is fully weatherproof.
The turbine is seated in the flashing collar and the tiles are reinstated over the apron, leaving a clean, leak-free finish.
Installation differs by roof: on tiled roofs we cut and flash the penetration under the tile course, while on metal roofs the vent is flashed directly into the sheeting. Both need the flashing done properly — a rushed vent install is a classic future leak.
Installations are carried out by an insured team and the workmanship is backed by a 7-Year Workmanship Guarantee and a 10-Year Dulux Acratex Material Warranty.
Current offer · Wollert
Configure & Buy Online
Fastest way: call now and talk to a roofer, not a call centre. Prefer to see pricing and this month's offer first? Book online — it takes 30 seconds.
Mon–Fri 7am–6pm · Sat 8am–2pm · Free, no-obligation quotes
Melbourne's Trusted Roofing Team, Since 2008.